The first and second sections
• facade works (bonded thermal insulation of the facade) and arrangement of internal engineering networks are underway.
The third section
• monolithic works are underway on the 8th floor.
Underground parking lot
• the floor slab is being arranged.
Shopping center
• tiles have been laid on the floor of the shopping center;
• work has been completed in the regular bathrooms and bathrooms for people with special needs;
• external and internal stained-glass windows are ready;
• installation of the ventilation and air conditioning system has been completed;
• landscaping of the territory has been completed;
• electricity and water supply systems have been completed.