The first and second sections
• facade works (bonded thermal insulation of the facade) and arrangement of internal engineering networks are underway.
The third section
• monolithic works are underway on the 8th floor.
Underground parking lot
• the floor slab is being arranged.
Shopping center
• tiles have been laid on the floor of the shopping center;
• work has been completed in the regular bathrooms and bathrooms for people with special needs;
• external and internal stained-glass windows are ready;
• installation of the ventilation and air conditioning system has been completed;
• landscaping of the territory has been completed;
• electricity and water supply systems have been completed.
WORKING HOURS OF SALES DEPARTMENTS DURING THE HOLIDAYS
From December 31 to January 11 inclusive, the sales and accounting departments will be closed.
30.12.2025
2025 RESULTS FROM “NOVABUDOVA” COMPANY
As a tradition, at the end of the year we summarize our achievements.
30.12.2025
CONSTRUCTION OF THE RESIDENTIAL COMPLEX "CRYSTAL AVENUE": MONTHLY DIGEST (DECEMBER 2025)
Herein we are telling you about the construction progress of the Crystal Avenue residential complex in Petropavlivska Borshchahivka.
30.12.2025